Update of the works in the Mercuriushaven near the lay-by jetty for inland ships at the tail end

2024/09
From 23 Oct 2023 until 15 Mar 2024
Area Port basin - Mercuriushaven

Period: From 23 October 2023 to 15 March 2024

 

The area indicated in drawing N0773_v02 (see Appendix), located in the Mercuriushaven near the lay-by jetty for inland ships at the tail end is closed to shipping traffic due to the construction of a new lay-by jetty for coasters. 

 

The works include:

  • Removal of the old lay-by jetty for inland ships;
  • Dredging operations;
  • Construction of a new embankment;
  • Construction of new lay-by jetty for coasters.

 

During the period mentioned above, the activities will be carried out from Monday to Friday from 06.00 to 16.00 LT. The work ships involved in this construction project will keep a listening watch on VHF channel 04.

Basijn 092024 nl.pdf (pdf 432kb)
Basijn 092024-EN.pdf (pdf 437kb)