Corona: measures corona virus at Port of Amsterdam
27 May 2020
In order to limit the spread of the coronavirus as much as possible, employees of Port of Amsterdam will be working from home as much as possible from 13 March until at least 31 March. This is in line with the measures announced by the Cabinet on 12 March.
All employees can be reached by phone or e-mail. Scheduled meetings can be held by telephone or video call. Information meetings and group meetings are cancelled or rescheduled.
The operational services provided by the Harbour Master's Division run 24/7. Here too, some precautions will be taken, but these do not stand in the way of the continuity of the operation.