You are here: Home News

News

Filter on:
All
About:
All
Or:
All
Terreininrichting Zeesluis IJmuiden
22-04-2021

The how, what and where of the site layout of Zeesluis IJmuiden

The construction of Zeesluis IJmuiden is almost completed. Now that all the lock gates have been put in position, the area around the new sea lock is being prepared for its future use. During the preparation of the area, everything will be made ready for the opening of the lock.
Sluisdeuren Zeesluis IJmuiden ingevaren
22-04-2021

All the lock gates have been put into position

In March 2021, the last two lock gates on the canal side were successfully installed. The whole operation lasted four days. Edgar Breedveld and Victor Arnolds were involved in this milestone achievement. They directed the positioning process and ensured a good outcome.
Opleiding sluisbedienaars SOC Zeesluis IJmuiden
22-04-2021

Working together to train lock and VTS operators

Zeesluis IJmuiden will soon be ready for use. But first, staff will have to master the ins and outs of operating the lock. Mia Dröge is Strategic Advisor to the Harbour Master's Division of Port of Amsterdam. Together with a team, she will ensure that the lock can be operated safely.
Duiken Zeesluis IJmuiden
22-04-2021

Diving operations at Zeesluis IJmuiden

There are also divers at work for the construction of Zeesluis IJmuiden (the new sea lock). They are busy with underwater engineering and construction activities. Max Schellenbach and Jan-Pieter Steunebrink of Boskalis are responsible for the Boskalis diving department and the execution of the work for OpenIJ. They told us about the work of their divers.
bodembescherming Zeesluis IJmuiden
22-04-2021

Three questions to Bart and Henk about the bottom protection system for Zeesluis IJmuiden

A larger lock means bigger ships and more salt water. The locking process creates large volumes of fresh or salt water flowing into or out of the lock and water turbulence may scour out holes near the inner and outer lock heads, undermining them.
Riviercruiseschip in Amsterdamse haven
20-04-2021

Implementation date Green Award requirement for river cruise ships postponed

Port of Amsterdam has decided to postpone the implementation date of the Green Award requirement for river cruise ships for a year to 1 January 2023 in order to accommodate the industry. The pandemic has hit the river cruise industry hard.